A blank space or an ‘NR’ indicates no readings received.

An ‘e’ indicates that the water level has been estimated.

A ‘w’ indicates that the conditions were very windy, resulting in an inaccurate reading.

Omatjenne Dam does not have abstraction facilities.

The dam contents are according to the latest dam basin surveys.

The inflow that is reflected in the bulletin does not take into account evaporation and abstraction of water.

An ‘N/A’ indicates that there is no rain gauge at the dam.

  • * Transfers from Swakoppoort Dam to Von Bach Dam started on 30/04/2025 with no interruptions.

    The transfer from Omatako to Von Bach was carried out.

    The water level at Neckartal Dam as of 28 April 2025 will be available.